SIGNALVAULT / CUSTOM RF SHIELDING
Custom RF Shielding Covers for Large & Irregular Equipment
Equipment-specific fit, closures and service interfaces, with manufacturing, installation and testing planned for the actual use environment.

Design around the complete equipment envelope
Record the maximum dimensions, including handles, cables, protrusions and moving parts in their intended storage configuration. A rectangular bounding box helps an initial review, but irregular profiles require dimensioned sketches and photographs. Never send confidential equipment details through a public form.
Separate storage from operation
A fully closed storage cover and an enclosure around operating equipment have different requirements. Identify heat, ventilation, power, data and operator access. Do not operate equipment under a closed cover unless the project has explicitly addressed safe operation and cooling.
| Interface | What to define |
|---|---|
| Closure | Access frequency, handling, sealing sequence and inspection access |
| Service entries | Every required cable, pipe or connection and its operating condition |
| Support and movement | Mounting, lifting, packing and abrasion points |
| Environment | Indoor/outdoor exposure, cleaning, moisture and temperature |
| Verification | Frequency targets, attenuation criteria, positions and final installed state |
Manufacture, installation and acceptance
The agreed scope can cover custom manufacture, equipment-specific fit, service integration, delivery planning, overseas installation and acceptance testing. Confirm site preparation, unloading, local services and handover responsibilities in the proposal.
Vehicle covers need their own fit review
For a vehicle, record its full storage envelope, mirrors, accessories and intended closure at the base. A cover hanging to the floor is not proof of a continuous shielding boundary. Define the complete closure arrangement and verify the actual installed configuration.
Use our custom Faraday cover specification guide to prepare the first brief.
Updated 13 November 2026. Planning information; project requirements and verification are agreed individually.