BUILDING & SPACE SHIELDING

RF & EMP Shielding for Rooms & Buildings

Shield an existing room or create a new modular space, with RF and EMP requirements defined for your use. We can coordinate shielding construction, transport, customs clearance, on-site installation, interiors, furniture and agreed testing for private and organizational projects.

Room-scale shielding · Complete interior fit-out · International delivery

RF signal examples

  • Cellular
  • Wi-Fi
  • Bluetooth
  • GPS / GNSS

RF means radio-frequency shielding for selected wireless signals. EMP means electromagnetic pulse protection; its exposure and acceptance requirements are specified separately.

AI concept visualization of an RF shielded room during interior fit-out, with most wall and ceiling finishes installed, a technician fitting a panel, and the shielding liner visible in an unfinished area

Discuss Your Space

Start with the room’s intended use and project location. Approximate dimensions help if you have them; drawings and technical specifications can follow.

Contact us anytime to discuss your project development and details in real time.

Tell Us About Your Project

Tell us which space you want to shield and how it will be used. You can share detailed specifications later.

We’ll review your message and reply by email.

Have detailed specifications? Use the full project form.

01 / TRANSPORT & ARRIVAL

We Bring the Components to You.

Modular shielding panels, doors and project components are packed for transport to your home or facility. SignalVault can manage international shipping, import clearance, local delivery and unloading. We agree vehicle access, unloading equipment, storage and site readiness before dispatch.
  • Protective packing
  • International transport & customs
  • Delivery & unloading
  • Access and site planning
Concept visualization of protected modular shielding components being unloaded from a delivery truck at a private residence

02 / ON-SITE SHIELDING INSTALLATION

Built Around the Whole Room.

Our team assembles modular shielding panels to the approved room layout, connecting the walls, floor and ceiling with the specified door and service interfaces. The installation follows the room dimensions and construction plan; interior finishing follows the agreed assembly and inspection sequence.
  • Full-height modular wall panels
  • Coordinated floor & ceiling boundary
  • Doors and planned service entries
  • On-site assembly & inspection
Concept visualization of technicians installing full-height modular shielding panels inside an existing room

03 / INTERIOR FIT-OUT

Finished for the Way You Work.

Once the shielding construction is ready for fit-out, we complete the agreed wall, ceiling and floor finishes, lighting, ventilation and furniture. A private office can have warm timber finishes and a practical workstation; meeting rooms and laboratories receive interiors suited to their use.
  • Interior decoration
  • Lighting & ventilation
  • Office and meeting furniture
  • Coordinated service connections
Concept visualization of the completed private office with finished walls, ceiling, lighting and furniture

INTERIOR DESIGN & PRACTICAL INTEGRATION

How will your room work every day?

For a retrofit or a new modular room, agree the finished usable dimensions, access and services alongside the interior you want.

How much usable space will remain?

Agree the finished internal length, width and height after shielding, floor build-up and interior finishes. Include furniture, equipment, circulation and the component delivery route in the layout review.

How will doors, windows and daily access work?

Confirm clear openings, thresholds, opening direction and how often people or equipment will pass through. Any required glazing, door contacts and care needs are specified with the shielding boundary.

How are ventilation, cooling and comfort handled?

Plan occupancy, equipment heat, ventilation and cooling together. Airflow paths and service entries are coordinated with the target frequencies, room configuration and agreed installation scope.

Can I still use power, internet and meeting equipment?

Yes. Power, data, lighting and presentation services can be integrated through specified interfaces. Fibre-optic routes, treated wired connections and power filtering are coordinated with the room.

Internal networking is defined in the design. External mobile or Wi-Fi signals targeted by the shielding should not be assumed to pass through; any internal wireless service needs an agreed arrangement.

RF & EMP DESIGN AND VERIFICATION

How will the shielding be specified and checked?

Agree the frequencies and RF / EMP objectives, the complete room configuration and the evidence required for acceptance before production.

What if I do not know the technical specification yet?

Start with the room use, equipment and outcome you need. Known frequencies, attenuation targets, EMP exposure or a project standard can then be reviewed with the design; a complete specification is not needed for the first conversation.

What forms the complete shielding boundary?

The walls, floor, ceiling, joints, doors, glazing and airflow paths are coordinated as one enclosure. Openings and access arrangements are included in the agreed closed configuration.

How are connected services protected?

Declare power, data and control connections so filtering, transient protection and service access can be specified for the agreed RF and EMP objectives.

What will the acceptance records cover?

Agree the test object, completed configuration, frequencies, methods, test locations and pass criteria, plus the records to be supplied. RF attenuation and EMP-related verification follow their respective requirements. Low-frequency magnetic shielding, when needed, requires its own design and verification.

04 / VERIFICATION & HANDOVER

What will your proposal and handover include?

The proposal defines the included work, site responsibilities, approval stages and acceptance requirements before work begins.

01

A clear scope and quotation

Identify included, excluded and client-provided work: shielding components, finishes, services, transport, customs, unloading, installation and testing. Confirm site readiness, access, charges and the project schedule.

02

Agreed acceptance checks

Confirm who carries out each check and when. Review the installed room and services against the scope, then carry out the specified RF tests and EMP-related verification in the agreed configuration.

03

Records and everyday care

Agree the test records, operating information and care guidance for doors, contacts and service interfaces. Define approval, handover and any further support in the project scope.

PROJECT QUESTIONS

Planning your room project

A few practical details help us review your project and prepare a relevant next step.

Can you manage transport, customs and installation?

Yes. We can manage packing, international transport, import clearance, local delivery, unloading, on-site installation, interior fit-out and agreed testing. The proposal sets out the scope, charges, site arrangements and responsibilities before work begins.

What do the pictures show?

The images illustrate room formats, construction ideas and possible finishes. They are not completed customer-project records. Final dimensions, construction and any project-specific verification are confirmed in the agreed scope.

Does RF shielding also make a room soundproof?

RF shielding and acoustic isolation are different design objectives. If speech privacy or acoustic treatment is part of the brief, raise it separately so the required construction and evaluation can be defined.

How are price and timing determined?

They depend on dimensions, room format, shielding requirements, finishes, openings, service interfaces, location and the installation/testing scope. We review the project before confirming a quotation and delivery schedule.

What is enough for a first conversation?

Tell us where the room is and how you would like to use it. Approximate dimensions and whether it is an existing or new space help; drawings, finishes and technical requirements can be developed during the review.

Can one room project include both RF and EMP shielding?

Yes. Both can be included in a retrofit or a new room. We coordinate the enclosure, service protection and the verification requirements within one project specification.

BUILDING & SPACE PROJECT INQUIRY

Tell Us About Your Space

A short description is enough to start. Measurements, drawings and technical specifications can follow when you have them.

Contact us anytime to discuss your project development and details in real time.

Add project details (optional)

Your details will be used to respond to this project inquiry.