
Retrofit the Space You Already Have
Adapt an existing room. Review the walls, floor, ceiling and services together, then confirm the finished usable space, site access and work needed before installation.
BUILDING & SPACE SHIELDING
Shield an existing room or create a new modular space, with RF and EMP requirements defined for your use. We can coordinate shielding construction, transport, customs clearance, on-site installation, interiors, furniture and agreed testing for private and organizational projects.
Room-scale shielding · Complete interior fit-out · International delivery
RF signal examples
RF means radio-frequency shielding for selected wireless signals. EMP means electromagnetic pulse protection; its exposure and acceptance requirements are specified separately.
Inizia dall’uso previsto e dalla sede del progetto. Le dimensioni approssimative sono utili se disponibili; disegni e specifiche tecniche possono seguire.
Contattaci in qualsiasi momento per discutere in tempo reale lo sviluppo e i dettagli del tuo progetto.
Choose a retrofit for an existing room or a modular enclosure for a new space. Start with the usable room size, everyday access and the power, data and ventilation you need.

Adapt an existing room. Review the walls, floor, ceiling and services together, then confirm the finished usable space, site access and work needed before installation.

Create a freestanding room around your available footprint. Confirm finished internal dimensions, component delivery routes, door clearance and the agreed interior package.

Plan a private study or dedicated room that feels at home. Coordinate discreet finishes, lighting, ventilation and daily access with the shielding design.

Plan seating, presentation equipment and the connections your meetings need. Power, internal networking, ventilation and door use are defined with the room; acoustic privacy is a separate requirement.

Keep everyday work practical. Plan furniture clearance, comfortable lighting, equipment connections and frequent entry alongside the shielding boundary and finished room dimensions.

Start with the instruments and measurements you need. Agree working clearances, power and data interfaces, target frequencies and the completed configuration used for acceptance.

Plan cooling, power, data and maintenance access around the equipment. Heat loads and service routes help define the enclosure and the agreed interface treatment.

Plan around vehicle size and daily entry. Confirm the clear opening, ventilation, service routes and interior finishes for your garage or dedicated parking room.
01 / TRANSPORT & ARRIVAL
02 / ON-SITE SHIELDING INSTALLATION
03 / INTERIOR FIT-OUT
INTERIOR DESIGN & PRACTICAL INTEGRATION
For a retrofit or a new modular room, agree the finished usable dimensions, access and services alongside the interior you want.
Agree the finished internal length, width and height after shielding, floor build-up and interior finishes. Include furniture, equipment, circulation and the component delivery route in the layout review.
Confirm clear openings, thresholds, opening direction and how often people or equipment will pass through. Any required glazing, door contacts and care needs are specified with the shielding boundary.
Plan occupancy, equipment heat, ventilation and cooling together. Airflow paths and service entries are coordinated with the target frequencies, room configuration and agreed installation scope.
Yes. Power, data, lighting and presentation services can be integrated through specified interfaces. Fibre-optic routes, treated wired connections and power filtering are coordinated with the room.
Internal networking is defined in the design. External mobile or Wi-Fi signals targeted by the shielding should not be assumed to pass through; any internal wireless service needs an agreed arrangement.
RF & EMP DESIGN AND VERIFICATION
Agree the frequencies and RF / EMP objectives, the complete room configuration and the evidence required for acceptance before production.
Start with the room use, equipment and outcome you need. Known frequencies, attenuation targets, EMP exposure or a project standard can then be reviewed with the design; a complete specification is not needed for the first conversation.
The walls, floor, ceiling, joints, doors, glazing and airflow paths are coordinated as one enclosure. Openings and access arrangements are included in the agreed closed configuration.
Declare power, data and control connections so filtering, transient protection and service access can be specified for the agreed RF and EMP objectives.
Agree the test object, completed configuration, frequencies, methods, test locations and pass criteria, plus the records to be supplied. RF attenuation and EMP-related verification follow their respective requirements. Low-frequency magnetic shielding, when needed, requires its own design and verification.
04 / VERIFICATION & HANDOVER
The proposal defines the included work, site responsibilities, approval stages and acceptance requirements before work begins.
01
Identify included, excluded and client-provided work: shielding components, finishes, services, transport, customs, unloading, installation and testing. Confirm site readiness, access, charges and the project schedule.
02
Confirm who carries out each check and when. Review the installed room and services against the scope, then carry out the specified RF tests and EMP-related verification in the agreed configuration.
03
Agree the test records, operating information and care guidance for doors, contacts and service interfaces. Define approval, handover and any further support in the project scope.
PROJECT QUESTIONS
A few practical details help us review your project and prepare a relevant next step.
Yes. We can manage packing, international transport, import clearance, local delivery, unloading, on-site installation, interior fit-out and agreed testing. The proposal sets out the scope, charges, site arrangements and responsibilities before work begins.
The images illustrate room formats, construction ideas and possible finishes. They are not completed customer-project records. Final dimensions, construction and any project-specific verification are confirmed in the agreed scope.
RF shielding and acoustic isolation are different design objectives. If speech privacy or acoustic treatment is part of the brief, raise it separately so the required construction and evaluation can be defined.
They depend on dimensions, room format, shielding requirements, finishes, openings, service interfaces, location and the installation/testing scope. We review the project before confirming a quotation and delivery schedule.
Tell us where the room is and how you would like to use it. Approximate dimensions and whether it is an existing or new space help; drawings, finishes and technical requirements can be developed during the review.
Yes. Both can be included in a retrofit or a new room. We coordinate the enclosure, service protection and the verification requirements within one project specification.
BUILDING & SPACE PROJECT INQUIRY
A short description is enough to start. Measurements, drawings and technical specifications can follow when you have them.
Contattaci in qualsiasi momento per discutere in tempo reale lo sviluppo e i dettagli del tuo progetto.